Adjustable Timing Belt Tensioner
$85 – $1052-5 Day Build Time
Don’t get stranded from a common failure, use our tensioner for reliability!
Showing 1–15 of 92 results
2-5 Day Build Time
Don’t get stranded from a common failure, use our tensioner for reliability!
2-5 Day Build Time
Coil Pack Wiring Harness for Plug & Play Megasquirt 2 (MSPNP2) King6fab’s color coded wiring harness’s, eliminates the headache, confusion and risk for problematic wiring. These harness’s will stretch from the PNPMS2 located in the cabin, through the firewall, to the coil drivers, from the coil drivers to the coil pack and from the coil…
1 in stock (can be backordered)
Small Details Matter! This bushing set is designed as a direct replacement of the stock rubber prop rod bushing. Features: The material used for these bushings is heat & abrasion resistant virgin Delrin® Acetal Plastic Included in this set: 2 Bushing Halfs as pictured. Missing a hood prop holder? Check out our free 3d Print file…
2-5 Day Build Time
Select your Vehicle Year and Option
2-5 Day Build Time
[vc_row][vc_column][vc_column_text]Nissan side feed injectors wiring harness completely sleeved, heat shrunk, with weather pack connection and wired for megasquirt systems. [/vc_column_text][special_heading title=”Options” subtitle=”Injection Wiring Options”][/vc_column][/vc_row][vc_row][vc_column width=”2/3″][vc_column_text]Batch Injection Batch Injection is the most commonly used, each injector bank is run in a batch. Batch Injection is used on MS1,MS2 and MSPNP2.[/vc_column_text][/vc_column][vc_column width=”1/3″][vc_single_image image=”4930″][/vc_column][/vc_row][vc_row][vc_column width=”2/3″][vc_column_text]Sequential Injection Sequential…
10-16 Day Build Time
If your one of the unfortunates to have a broken OEM expansion tank and cannot find options or are finding used options that are being price gouged, King6fab has a solution for you. What’s new with the V3 Design? 2.0 OD x .120wa 5052 Aluminum Tubing. 3/4 Aluminum side hose barb end. 5/8 Brass 90deg…
2-5 Day Build Time
This kit is the raw materials to build your own front cross member using tubing type of your choice.
2-5 Day Build Time
These brackets are made from aluminum, strong and light weight. Designed to replace the stock radiator support brackets directly without modification. They add a custom look, will not rust, bend or fall apart like the stock supports. Installation takes less then 5min and requires a 14mm wrench. Features: Replaceable rubber grommets Aluminum material, will not…
2-5 Day Build Time
Not Available for Purchase
If your looking for an extra custom look under the hood, a fuse box cover plate is a first step. An easy modification, that gets attention. These plates come blank and can be mounted with double sided adhesive. 11GA 6061 Aluminum Sheet Sanded Brushed Polished 1 Fuse Box Cover Plate equipped with…
2-5 Day Build Time
50 in stock
This is a downable Package only.
The package is a 23.4mb zip file.
The package only includes information and files to build the shown cart.Â
End of content
End of content
Store Notice
4/13/2025
Subtotal: $12
1 in stock (can be backordered)
2-5 Day Build Time
2-5 Day Build Time
2-5 Day Build Time
36 in stock (can be backordered)
2-5 Day Build Time